Unplanned Outage February 26, 2020

Feb 26, 2020
12:30 pm - 2:30 pm
An unplanned outage occurred on February 26, 2020 at approximately 12:30 pm affecting a large number of customers. The reason for the outage was a propane truck had taken out a hydro pole on a main 44 KV feeder outside of InnPower's service territory that feeds InnPower customers. Hydro One notified InnPower that the feeder was locked out and asked if they can close it in. Per InnPower's policy, a waiting period of 10 minutes is required to determine if any police or fire emergency calls are received and to determine if any crews are working in the affected areas.

After the waiting period, both InnPower and Hydro One crews began patrolling their respective infrastructure to determine the cause.

Patrolling is a necessity to ensure safety for people and equipment before closing in switches and restoring power. This can take some time to get crews to the affected area and then patrol all of the lines to ensure there are no faults present.

The cause was discovered at 1:33 pm reported by Hydro One. At that time InnPower staff had finished patrolling and could safely switch the affected customers to an alternate feeder.

A switching order was engineered and executed at approximately 2:36 pm to restore power to all affected InnPower customers until Hydro One can make repairs at which time we will transfer load back to the repaired feeder.



x

Cashiering Desk Closed - Inclement Weather

Our cashiering desk is closed today, Thursday, Feb 13 due to inclement weather, and will reopen tomorrow, Friday, Feb 14, for regular business hours. 

Please note that Customer Service will still be available over the phone and by email to assist you!

We thank you for your patience and cooperation during this time.                             
x

DISCLAIMER:

This hosting capacity map is provided for informational purposes only. It is not intended to be, and should not be relied upon as, a basis for determining the permissible capacity of distributed energy resources (DERs) that may be interconnected to the distribution system. Separate and specific analysis is required to determine DER capacity on the distribution system. Further, the information, data and materials are provided on an “as is” basis and while InnPower Corporation provides this information in good faith, INNPOWER CORPORATION does not warrant, covenant or guarantee, in an expressed or implied form, arising by law or otherwise, the completeness, effectiveness, accuracy and/or fitness or the information for any particular use. INNPOWER CORPORATION does not assume responsibility nor accept any liability arising from any use of the information. This information is proprietary and may not be reproduced without consent from INNPOWER CORPORATION.

By clicking the "ok" button below I am stating that I understand and accept the above disclaimer.

Ok